
Electromagnetic Pneumatic Valve
The first draft was too weak and ran too hot.
Actuator design, Munich University of Applied Sciences, Winter 2025/26 · 3 months

Populated PCB, display, CO₂ sensor, push-turn knob: the university had built the entire electronics for the lecture-hall thermostat itself, and none of it had anywhere to sit yet. A lecture hall is public space, so the enclosure had to stay serviceable while stopping anyone from opening the control on their way past, built on the machines the university already had.
Lid, four latch holders and the flexible latch merged into one SLS part, six pieces down to one, printed in place with a 0.3 mm gap. The latch still springs even printed; what's still open is how many cycles it takes before it doesn't. Seven major revisions sit in between, plus around a hundred small ones, each triggered by a specific problem with the last: strain relief, screw countersinks, hole sizes, and enough height for a sensor soldered on late.
The final revision became an installed series that's been running in the lecture hall since it went in, shown here in the design state it was actually built from.













The first draft was too weak and ran too hot.
Actuator design, Munich University of Applied Sciences, Winter 2025/26 · 3 months

A trade fair stand lives for three days.
Semester project with a packaging manufacturer, Summer 2023 · 3 months

The interesting part starts when the network drops.
Data communication, Munich University of Applied Sciences, Winter 2025/26 · 3 months

Friday morning, an open brief. Sunday at nine, hand-in.
VDI student competition “Mobility goes Additive”, Friedrichshafen, 17–19 April 2026 · 3 days

Two real quotes for the same part, more than double apart.
Mechatronic Product Development, Munich University of Applied Sciences, Winter 2025/26 · 3 months

A safety sensor that hung like a forgotten ID badge.
Design cooperation with BMW, module TD5, THD, Winter 2023/24 · 3 months
Ansys proposes a shape, then gives up.
Simulation, Munich University of Applied Sciences, Summer 2026 · 3 months

A new plant needs furniture for the shift briefing.
Cooperation project with BMW, Summer 2023 · 3 months
The simulation returns tables. It never says where the bottleneck is.
Built alongside the course, Summer 2026 · 3 months

One curve does the handle, the rim and the stacking.
Semester project, Summer 2022 · 3 months

An industrial engine looks like what it is: a machine.
Collaboration with mtu / Rolls-Royce Power Systems, Winter 2022/23 · 3 months

Open, the board bends in your hands.
Semester project with a packaging manufacturer, Summer 2023 · 3 months

A home battery that looked like a switch cabinet.
Design cooperation with Prolux Solutions, THD, Mar–Jul 2023 · roughly 3.5 months

A cardboard box that makes a speaker louder without adding a single watt.
Material workshop, THD, 29 Apr – 7 May 2023 · one week